Logistics center Giengen an der Brenz
Prospective new construction of a green building next to distribution center
GARBE is developing a 23,000 sqm property, which is equipped with both roof greening and a PV system. An indoor ship is equipped with a WHG film, otherwise the high GARBE standards are taken into account in the construction as usual. The area is divisible from a size of approx. 5,700 sqm and is equipped with a representative office building.
Next door, GARBE is building an Amazon distribution center. Due to its excellent location directly on the A7, the motorway can be reached within a few minutes without passing through the village. With this distribution center, the districts of Heidenheim, Ulm, Dillingen and Neu-Ulm and thus more than 550,000 people can be supplied with parcels. The hall area 2 was rented to the company Tesla.
| Usage | Logistics |
| Plot area | approx. 77,990 sqm |
| Hall area | Hall 1 tenant Amazon
Hall 2 tenant Tesla |
| Office and social space | Hall 1 approx. 2,200 sqm
Hall 2 approx. 688 sqm |
| Number of gates | Hall 1: 6 goals at ramp level
Hall 2: 24 goals at ramp level |
| Parking spaces | Hall 1: 112 car parking spaces
Hall 2: 113 car and 4 truck parking spaces |
| Features | Pre-equipment photovoltaic-system
Partial WGK |
Sustainability aspects
|
I look forward to hearing from you!
Send me your request simply and easily by form.
Services of GARBE in this project
Location
The property is a former greenfield. The area will be developed into a commercial-industrial park. The property is built with two halls. The BTS is an envelope warehouse for Amazon.
Planning
Together with our client and the selected general contractor, we realize the planning and implementation of the property.
Consulting
Together with our customer, we can respond to all necessary logistical construction requirements for the logistics property and design the logistics processes as effectively as possible.
Construction
The large modern logistics centre is to be completed in the first phase of construction by Q1 2022 and in the second construction phase by Q3 2022. Next door, GARBE is building an Amazon distribution center. Due to its excellent location directly on the A7, the motorway can be reached within a few minutes without passing through the village.Adrian Zellner
Location Giengen
Our project developments
Distribution centre Messkirch
Thanks to the distribution centre in Messkirch, the southernmost area in Baden-Württemberg can now also be reached by short delivery times with Amazon packages. Particularly attractive: the central location between the districts of Sigmaringen and Tuttlingen.
Fulfillment Center Achim
A 3-storey distribution and logistics project is being built at the Achim site. This realization of a fulfillment center over several floors is the first of its kind for GARBE.
To the project
Logistics property Harsum
At the Harsum site, north of Hildesheim directly on the A7, a multifunctional and flexible logistics property with around 150 m2 of office space is being built.
Osnabrück Logistics Centre
With Koch International, we create new things! On 42,000 m2 of land, we realize a modern logistics center in Osnabrück.