Logistics property Kabelsketal
New logistics building in Kabelsketal
The approximately 100,000 square meter site, on which the logistics property with a total area of around 61,500 square meters will be built, is located in the immediate vicinity of federal highway 6, which connects the site with the Berlin – Munich 9 freeway. The Großkugel junction is three kilometers away. From there, it is six kilometers to the Schkeuditzer Kreuz interchange with the Magdeburg-Dresden 14 freeway and a direct connection to Leipzig/Halle Airport.
Garbe Industrial Real Estate GmbH has let around a third of the logistics property in Kabelsketal (Saalekreis, Saxony-Anhalt) before construction has even begun. A well-known e-commerce company will move into two hall units with a total area of approx. 23,500 square meters. In addition, Garbe Industrial Real Estate GmbH was able to conclude a lease agreement with Bravobike GmbH, which will use approximately 23,500 square meters in Kabelsketal for bike refurbishment and storage.
A hall area of approx. 14,400 sqm is currently still available, please contact us!
| Usage | Distribution and contract logistics |
| Plot area | approx. 97,316 sqm |
| Hall area | approx. 61,428 sqm |
| Office and social space | approx. 2,918 sqm |
| Number of gates | 54 Dock levellers |
| Parking spaces | 10 truck parking spaces 256 parking spaces |
Sustainability aspects
|
Anne Angerstein
Regional Manager North-East
Do you have any questions or can we help you?
I look forward to hearing from you!
Send me your request simply and easily by form.



Anne Angerstein
Regional Manager North-East
Do you have any questions or can we help you?
- +49 40 35613 - 1593
- +49 40 35613 - 2810
Services of GARBE in this project
Location
The property has excellent connections to the A9 and A14 highways and is in the immediate vicinity of Leipzig/Halle cargo airport. Thanks to the S-Bahn station within walking distance, the location is also very easy for employees to reach by public transport.
Planning
Together with our client, who has rented around a third of the property, and the selected general contractor, we are realizing the planning and implementation of the property.
Advice
Together with our customer, we can respond to all necessary logistical construction requirements for the logistics property and design the logistics processes as effectively as possible. The selected fit-out standards for the speculative part of the logistics park guarantee the highest possible third-party usability for a large number of potential tenants.
Construction
The large, modern logistics center is to be completed in less than 12 months, fully let at the same time and then handed over to the customer(s). A decisive reason for the purchase of the property and the early pre-letting was the convenient location and the excellent public transport connections.Adrian Zellner
Location Kabelsketal
Our project developments
Logistics Center Bitterfeld-Wolfen
Due to the possible total size of the contiguous 110,000 m² hall area, the property in Bitterfeld-Wolfen is one of the last large plots in Saxony-Anhalt with a direct motorway location, which has an existing building right.
To the project
Logistics property Hörselberg-Hainich
Due to its excellent location on the A4, GARBE was able to bind the tenant BCUBE Logistik GmbH to the Hörselberg-Hainich location for a long-term lease.
Bollberg Logistics Centre
GARBE was able to secure around 65,000 sqm of land at this strategically and logistically very attractive location close to the Hermsdorfer Kreuz junction.
Industrial park Duisburg
Garbe Industrial Real Estate GmbH has started redevelopment work on its site in Duisburg’s Meiderich district.
The 56,000 square meter brownfield site, which the Hamburg-based project developer acquired a good two years ago, is located on the so-called “Zeus site”, which was used by the steel industry until the end of the 20th century.